2024
2025
1.150.000,00 €
IN PROGRESS
Main lines of work:
- Airspace compatibility: Analysis of the coexistence between the operational environment of the Canarias Stratoport and Fuerteventura Airport, assessing the impact on its ATZ/CTR.
- Design of airspace structures: Study and proposal of optimal configurations for different operational layers, from low-altitude flights to stratospheric operations (up to FL600), based on the current and future needs of the Stratoport.
- Regulatory processing: Preparation of the technical documentation required for the processing, approval, and eventual publication of the proposed structures before the competent authorities.
- Risk Assessment (ARA): Development of a specific airspace risk assessment for the potential designation of a U-space volume in the vicinity of the Stratoport.
- Definition of technical requirements: Analysis of the state of the art and operational needs to define the technical requirements of the key systems required by the infrastructure: high-altitude meteorology, light UAS hangars, ground-to-air communications, and tracking systems.
- Contingency and emergency plan: Design and drafting of a specific plan that includes procedures for unforeseen situations, incidents, or operational emergencies.
CO-FINANCED
IN COLLABORATION




